Project Management in monday.com: A Practical Guide

A small wooden rhino points with a little wooden pointer at a tidy board of coloured tiles on an easel while three wooden peg students watch.

monday.com has become one of the most popular project management platforms for teams who want visual workflows, powerful automations, and flexibility that actually scales. Whether you’re managing software sprints, marketing campaigns, or client deliveries, monday.com gives you the building blocks to track work your way.

This guide walks you through everything you need to know to run effective project management on monday.com in 2026 — from initial setup to advanced automations, with practical examples.

monday.com isn’t a traditional project management tool with rigid workflows and prescribed methodologies. It’s a flexible work platform that lets you build the exact system your team needs.

Capability What It Does Best For
Visual Boards Colour-coded status tracking with customizable columns Teams who need instant visibility
Multiple Views Kanban, Gantt, Calendar, Timeline in one board Different working styles on same project
Automations Trigger-based rules that eliminate manual work Reducing repetitive coordination tasks
Dashboards Cross-board reporting and analytics Portfolio-level visibility

The platform’s strength is its adaptability — you’re not locked into someone else’s idea of how project management should work.

monday.com serves teams across every industry, but it’s particularly popular with:

  • Marketing teams running campaigns with multiple deliverables, approvals, and deadlines
  • Software development teams tracking sprints, bugs, and releases
  • Professional services firms managing client projects and billable hours
  • Operations teams coordinating cross-functional initiatives
  • Creative agencies handling client requests, design iterations, and production schedules

The common thread? Teams that need visibility, flexibility, and collaboration without drowning in spreadsheets or rigid software.

Your project board is where all the work happens. Getting the structure right from the start saves hours of rework later.

Every monday.com board has the same fundamental components:

Component Purpose Example
Items Individual tasks or work units “Design homepage mockup”
Groups Sections that organize related items “Sprint 1”, “In Progress”, “Backlog”
Columns Fields that track information about items Status, Owner, Due Date, Priority

monday.com offers many column types. Here are the ones that matter most for project management:

Column Type Use It For Pro Tip
Status Workflow stages (To Do → Done) Use colour coding for visual scanning
People Task assignments One owner per task prevents confusion
Timeline Start and end dates with visual bars Reveals overlaps and dependencies
Dropdown Fixed choices (Priority, Category) Keep options under 10 for usability

Example: A sprawling project board with 47 columns makes information hard to find. Consolidating it to 12 essential columns with better column types (switching 5 text columns to dropdowns, merging 3 date columns into timelines) makes it easier to scan, and teams are more likely to use it consistently.

Start minimal — you can always add columns later. Most effective project boards use 8-12 columns max.

Views let you see the same data in different formats without duplicating information. Every project board should have these views configured:

View Type When to Use Setup Time
Main Table Daily task updates and details Built-in (default)
Kanban Sprint planning and workflow visualization 2 minutes
Gantt/Timeline Dependency mapping and schedule planning 5 minutes
Calendar Deadline tracking across the month 2 minutes

You can create multiple Kanban views grouped differently (by assignee, by priority, by sprint) — they all reference the same underlying data.

A solid project plan in monday.com answers five questions: What are we building? Who’s doing what? When is it due? What depends on what? How will we know we’re on track?

Most project managers use one of two approaches:

Approach 1: Group by Phase — groups: Discovery & Planning, Design, Development, Testing & QA, Launch.

Works well for waterfall projects with sequential phases.

Approach 2: Group by Sprint/Iteration — groups: Sprint 1 (Jan 15-28), Sprint 2 (Jan 29-Feb 11), Sprint 3 (Feb 12-25), Backlog.

Works well for agile teams running iterative cycles.

Good task granularity means each item is:

  • Completable in one sprint or less (ideally 2-5 days)
  • Assignable to one person as the primary owner
  • Independently trackable with its own status

Too granular? “Send follow-up email to John” (takes 10 minutes — not worth tracking). Too broad? “Build entire user authentication system” (weeks of work with multiple sub-components).

Timeline columns show your project schedule visually. Here’s how to set them up effectively:

Step Action Why It Matters
1. Add Timeline column Insert → Timeline Shows task duration as horizontal bars
2. Set dependencies Click timeline bar → add dependency Automatically adjusts dates when predecessors change
3. Identify critical path Look for longest chain of dependencies Delays here affect entire project delivery

Dependencies prevent your developer from starting before design is done, and prevent your QA team from testing before development finishes.

Pro tip: Use monday.com’s Timeline view (not just the Timeline column) for the best dependency management experience. You can drag timeline bars to adjust dates and click endpoints to create dependencies between tasks.

Project plans are great — until reality hits and you need to actually manage the work. Here’s how to keep things moving without micromanaging.

Status updates fail when they require too much effort. Make them effortless:

Update Type How to Do It Frequency
Task status Click status label, select new stage As work progresses (several times/day)
Item updates Comment with @mentions When something changes or questions arise
Progress photos Drag image into Updates section For visual/creative work

Set up status automations to notify stakeholders when key milestones hit “Complete” — they get updates without asking for them.

When a task has multiple distinct steps, use subitems instead of cluttering your main board:

Main Item: “Redesign checkout flow”

  • Subitem: Create user flow diagram
  • Subitem: Design mobile mockups
  • Subitem: Design desktop mockups
  • Subitem: Conduct usability testing

Subitems inherit the parent’s context but track independently. Roll up their status to the parent item so you see at a glance when all pieces are complete.

Every item can have files attached. Here’s the structure that works:

File Type Where to Attach Naming Convention
Source files Directly to item descriptive-name-v1.fig
Deliverables Item Files column FINAL-homepage-design.png
Reference docs Item Updates section As links, not duplicates

Never attach the same file to multiple items — use a Files column with links instead. One source of truth prevents version confusion.

Ready to optimize your monday.com project setup? Book a free 30-minute consultation with TaskRhino to review your boards and workflows.

Automations are where monday.com goes from “helpful” to “indispensable.” Every automation follows the same pattern: When [trigger] happens, then [action] occurs. Map the process before you automate it: our five steps to map a workflow cover the trigger, the owners and the dependencies.

Here are the automations that deliver the most time savings:

Automation Trigger Action Time Saved
Status notifications Status changes to “Complete” Notify project manager 30 min/week (eliminates check-ins)
Deadline reminders Due date arrives in 2 days Notify assignee 45 min/week (prevents missed deadlines)
Cross-board sync Item created in Requests board Create linked item in Projects board 1 hour/week (eliminates manual transfers)
Approval workflows Status changes to “Ready for Review” Notify reviewer + set due date 1.5 hours/week (eliminates approval bottlenecks)

Click the “Automate” button (top right of any board) → “Create custom automation”.

Example: Auto-assign when status changes: When status changes to “In Progress” → assign to Person column → notify that person via email.

This prevents tasks from sitting in “In Progress” with no owner.

Once you master basic automations, these patterns unlock serious efficiency:

Pattern 1: Multi-step approvals: When status changes to “Ready for Review” → Assign to Manager → Set Status to “Under Review” → Notify Manager via email.

When status changes to “Approved” → Move item to Production board → Create item on Launch Checklist board → Notify Marketing team.

Pattern 2: Time-based escalation: When an item has been “Blocked” for 2 days → notify project manager → set priority to “High”. monday.com has no built-in “days passed” trigger, so build it with a helper Date column: one automation sets the date to today when the status changes to “Blocked”, and a second one fires 2 days after that date.

Example: When project delays stay invisible until weekly status meetings, a time-based escalation (any task in “Waiting” status for 48+ hours notifies both the assignee and their manager) surfaces bottlenecks within days instead of weeks.

monday.com plans include monthly automation quotas:

Plan Actions/Month What Happens When You Hit Limit
Basic None Automations need Standard or above
Standard 250 72-hour grace period, then runs pause; the overage rolls into the next cycle as actions debt
Pro 25,000 Sufficient for most teams
Enterprise 250,000 Enterprise-level usage

Each time an automation fires, it consumes one action. A notification automation on a board with 100 items updated daily consumes 3,000 actions per month (100 items × 30 days).

Monitor your automation usage in Administration → Usage stats (or the Usage tab of the Autopilot hub) to avoid surprises.

See BoardBridge Forms in Action

Book a free demo of BoardBridge forms for monday.com — live, with your data.

Book a Free DemoFree 30-minute call · No obligation

The best project plan fails if your team is overloaded or key people are double-booked. monday.com gives you tools to see capacity before problems arise.

The Workload view (Pro and Enterprise) shows how many hours each team member has assigned across all their tasks.

Setup Step How To What It Shows
1. Add Numbers column Name it “Estimated Hours” Task-level effort estimates
2. Enable Workload view Add view → Workload Visual bars showing capacity per person
3. Set capacity limits Click person → set weekly capacity Red bars indicate overallocation

A developer with 40-hour capacity who has 55 hours of tasks assigned shows up red — you can rebalance before they burn out.

When someone is overallocated:

  1. Defer non-critical tasks — Move lower-priority items to next sprint
  2. Redistribute — Reassign tasks to team members with capacity
  3. Extend timeline — Adjust due dates to realistic completion dates
  4. Add resources — Bring in additional team members (last resort — onboarding has costs)

Check the Workload view during sprint planning, not mid-sprint when it’s too late. New to the Workload view? See our monday.com onboarding and training.

Use a dedicated Resource Management board to track allocation across multiple projects:

Column Purpose Formula (if applicable)
Person Team member name —
Project A Hours Hours allocated to Project A Linked from Project A board
Project B Hours Hours allocated to Project B Linked from Project B board
Total Hours Sum of all allocations {Project A Hours} + {Project B Hours}

This bird’s-eye view reveals when the same person is critical to three projects at once.

Dashboards aggregate data from multiple boards into one view. Your project stakeholders shouldn’t need to hunt through 5 boards to understand status.

Widget Type What It Shows Best Use
Chart widget Progress over time, status distribution Tracking sprint velocity, showing completion rates
Numbers widget Key metrics (tasks complete, days remaining) At-a-glance project health
Timeline widget Gantt view across multiple boards Portfolio-level schedule visibility
Workload widget Team capacity and allocation Resource management

Dashboard best practice: Organize widgets by audience. Executives care about delivery dates and budget. Team leads care about blockers and workload. Design separate dashboard tabs for each audience.

Don’t track everything — track what drives decisions.

Metric Formula/Source What It Tells You
Tasks completed this sprint Count of items with status “Done” Velocity (is team on pace?)
Overdue tasks Count of items where Due Date < Today and Status ≠ "Done" Risk indicator
Average task completion time Timeline column data analysis Process efficiency
Blocked items Count of items with status “Blocked” Bottleneck visibility

Set up automated weekly reports that email these metrics to stakeholders. They stay informed without constant meetings.

Create a “Project Overview” dashboard with:

  • Top section: Current sprint progress (chart + numbers)
  • Middle section: Upcoming milestones (timeline widget filtered to next 30 days)
  • Bottom section: Risks and blockers (board widget filtered to “Blocked” or “High Priority” items)

Share the dashboard link with stakeholders. They get real-time visibility without interrupting your team.

Most projects span multiple boards. monday.com offers several ways to connect them:

Connection Method Use Case Limitation
Mirror columns Display data from connected items Most can’t trigger automations or be mapped in them
Cross-board automations Create/update items on another board Counts toward your automation quota
Integrations Connect to external tools (Slack, Jira, etc.) May consume integration quotas

Example workflow: Client requests come into an “Intake” board. When approved, a cross-board automation creates a project item on your “Active Projects” board with all the request details pre-filled.

Dependencies usually live within a single board, but complex projects need cross-board dependencies.

Workaround: Use a Mirror column to display the linked item’s status:

  1. Connect boards via Connect Boards column
  2. Add Mirror column to show the linked item’s status
  3. Team members see when their dependency is complete

Not as elegant as true cross-board dependencies, but it works.

Want to streamline your cross-board workflows? TaskRhino specializes in complex monday.com setups that scale with your team.

If you run similar projects repeatedly (client onboarding, product launches, event planning), template boards are game-changers.

Step Action Result
1. Build master template Create board with standard structure, columns, automations Reusable project foundation
2. Duplicate for each project Board menu → Duplicate → Include structure + automations New project ready in 2 minutes
3. Update names/dates Customize for this project’s specifics Consistent process, unique details

Your template should include group structure, essential columns, common automations, and default items (recurring tasks every project needs).

Example: Setting up each new client matter board by hand (copying columns, recreating automations, defining workflows) can take a legal services team 2-3 hours. A master template board with standard columns, automations and recurring checklist items turns that into a duplicate-and-rename job.

When you’re juggling 5+ projects, the Portfolio solution (available on the Enterprise plan) gives you the bird’s-eye view.

Portfolio view aggregates multiple project boards into one consolidated timeline, showing:

  • Which projects overlap
  • Where resource conflicts exist
  • Overall portfolio delivery schedule

This is essential for resource-constrained teams where the same people work across projects.

Symptoms: You’re constantly asking “What’s the status on X?” Tasks stuck in outdated states.

Solutions:

  • Make it easier: Ensure status columns are visible and one-click to update
  • Create accountability: Show each person a Kanban view filtered to “My Tasks” so they see their board daily
  • Automate reminders: Notify the assignee 3 days after the status last changed (a helper Date column set to today on each status change, plus a date-based automation)
  • Lead by example: If leadership doesn’t update statuses, neither will the team

Symptoms: Team creates new boards for everything. 50+ boards in the workspace. No one knows which board contains what.

Solutions:

  • Naming convention: Use prefix structure (PROJECT-ClientName, TEMPLATE-ProcessName, ARCHIVE-OldProject)
  • Workspace organization: Use folders to group related boards
  • Sunset old boards: Archive boards older than 6 months that no one accesses
  • Consolidate: If 3 boards track similar work, combine them into one board with Groups

Symptoms: Team members ignore notifications because they get 50 per day.

Solutions:

  • Tune notification preferences: Settings → Notifications → customize what triggers notifications
  • Use @mentions strategically: Don’t @mention someone unless they need to take action
  • Batch updates: Use Updates section for multiple comments instead of separate notifications per item
  • Disable low-value automations: If an automation’s notification isn’t driving action, turn it off

Symptoms: Timeline view shows green, but the project is actually behind.

Solutions:

  • Update timelines weekly: Drag bars to reflect actual progress and revised estimates
  • Use dependencies correctly: Ensure dependent tasks auto-adjust when predecessors slip
  • Track actual vs. planned: Add a second Timeline column for “Actual Timeline” to compare
  • Review in stand-ups: Make timeline updates part of daily or weekly team syncs

Need Help With Your monday.com Setup?

TaskRhino has implemented monday.com for 110+ teams. Get a free consultation.

Schedule Free ConsultationFree 30-minute call · No obligation

Projects succeed or fail based on how well teams communicate. monday.com gives you tools to keep everyone on the same page.

Every item has an Updates section — think of it as a comment thread attached to that task.

Update Type When to Use Example
Status update Communicate progress or completion “Design review complete. Making final adjustments based on feedback.”
Question/blocker Ask for help or flag an issue “@Sarah — the API endpoint isn’t returning the user data we need. Can you check?”
Decision documentation Record why you chose an approach “Going with Option B because it’s faster to implement and meets 80% of requirements.”

Use @mentions to notify specific people. Attachments, links, and even GIFs work in Updates.

monday.com integrates with Slack, Microsoft Teams, and email to meet teams where they already work.

Integration Capability Setup Difficulty
Slack Get board notifications in Slack channels, create items from Slack Easy (5 min)
Microsoft Teams Embed boards in Teams tabs, notifications to channels Easy (5 min)
Email Create items by emailing the board, get notifications via email Built-in

Pro tip: Create a dedicated Slack channel per project and connect that project’s board. Team conversations and status updates happen in one place.

Need to involve clients, vendors, or contractors? monday.com supports guest users:

Use guest access to give clients visibility into their project without full workspace access.

Need help setting up guest workflows or advanced integrations? Let’s talk — TaskRhino offers free 30-minute consultations.

The best teams don’t just finish projects — they learn from them. Build retrospectives into your monday.com workflow.

Set up a dedicated “Retrospectives” board with these columns:

Column Type Purpose
Project Name Text Which project is this retro for?
What Went Well Long Text Successes to repeat
What Didn’t Work Long Text Problems to avoid next time
Action Items Connect Boards Link to improvement tasks

After each project closes, create a retrospective item. Bring the team together for 30-60 minutes to fill it out.

Retrospectives are worthless if insights sit unused. Connect your retrospective items to actionable tasks:

  1. Identify top 3 improvement areas from “What Didn’t Work”
  2. Create improvement tasks on a “Process Improvements” board
  3. Assign owners and due dates — someone needs to implement the change
  4. Track completion — don’t let improvements linger forever

Great retrospectives change how you work. Bad retrospectives vent frustration without action.

Over time, your retrospective board becomes an organizational knowledge base:

  • “We tried weekly sprints with this client type — it didn’t work. Two-week sprints were better.”
  • “External design reviews always add 3-5 days. Build that buffer into timelines.”
  • “This developer is great at backend APIs but struggles with frontend work. Staff projects accordingly.”

Search past retrospectives before planning similar projects. You’ve already learned these lessons — use them.

As your organization grows, project management gets more complex. monday.com scales, but you need to plan for it.

Larger organizations need standards to prevent chaos:

Governance Area Standard to Set Enforcement Method
Board naming PREFIX-ProjectName-YYYYMM Documented convention + training
Column types Standard set of columns for all project boards Template boards with locked structure
Status labels Consistent workflow stages Shared status templates
Automation patterns Pre-approved automation recipes Centralized automation library

Without standards, you end up with 100 boards that all work slightly differently.

Control who can see and edit what using board permissions:

Permission Level Can Do Use For
Viewer See all, edit nothing Executives, stakeholders
Member Edit board content (limit to assigned items on Pro and above) Team members
Owner Full control including board settings Project managers

Set permissions at the board level via Board menu → Settings → Permissions.

Use multiple workspaces to separate:

  • By department (Marketing workspace, Engineering workspace, Operations workspace)
  • By security level (Public workspace, Confidential workspace)
  • By business unit (Division A workspace, Division B workspace)

Workspaces organize boards but don’t seal them off: a dashboard can still pull in boards from another workspace when the board is accessible across workspaces.

monday.com keeps several logs:

  • Board Activity Log: who changed dates, statuses and other values, and moved items between groups, and when
  • Automation Run history: which automations ran and whether they succeeded, for the past 10 days
  • Audit log (Enterprise): when team members last logged in, from which device and IP address

Essential for regulated industries (finance, healthcare) where you need to prove compliance.

monday.com doesn’t exist in isolation. Connect it to the tools your team already uses.

monday.com lists 850+ integrations and apps. Most popular for project management:

Tool Integration Capability Use Case
Slack Notifications, item creation Team communication
Google Calendar Two-way sync with Date columns Schedule management
Jira Bi-directional sync Engineering teams using both tools
Zoom Create meetings from items Client calls and team syncs

Install integrations from the Integrations Center (accessible via any board’s Integrate button).

For tools without native integrations, use Zapier or Make (formerly Integromat):

Example: Connect monday.com to your CRM

  • Trigger: New deal closes in CRM
  • Action: Create project board in monday.com with client details pre-filled

This eliminates manual data entry between systems.

monday.com provides a GraphQL API for custom integrations. Development teams can:

  • Build internal tools that read/write monday.com data
  • Create custom dashboards outside monday.com
  • Automate complex workflows the UI doesn’t support

API documentation lives at developer.monday.com.

Choosing the right plan affects what features you have access to — and what limitations you’ll hit.

Feature Basic Standard Pro Enterprise
Boards Unlimited Unlimited Unlimited Unlimited
Timeline view
Automations/month None 250 25,000 250,000
Integrations/month None 250 25,000 250,000

Note: Table simplified for clarity. See monday.com pricing page for complete details.

Basic works for small teams (under 10 people) with simple workflows and no automation needs; Basic has no automations.

Standard is the sweet spot for most project teams. 250 actions per month covers light automation on a few boards. This plan includes Gantt view and calendar view.

Pro unlocks 25,000 automation actions per month, private boards, time tracking, formula columns, and dependency management. Essential for complex project environments.

Enterprise adds 250,000 automation actions per month, advanced permissions, audit logs, and enterprise-grade security. Required for large organizations or regulated industries.

  • Start with Standard, upgrade as needed: Don’t overpay for Enterprise features you won’t use immediately
  • Monitor automation usage: One runaway automation can consume your monthly quota in days
  • Use free viewers strategically: Stakeholders who only need visibility don’t require paid seats
  • Annual billing discount: Paying annually saves 18% compared to monthly billing

Stop Creating Duplicates

BoardBridge forms update existing items — no Enterprise plan, no workarounds, no duplicates.

See It In ActionFree 30-minute call · No obligation

12 questions

How can I automate cross-board workflows when a status changes in monday.com CRM without manually creating tasks in work management?

Use a cross-product automation: cross-board automation recipes work between monday CRM and monday AI work platform boards in the same account. For example, a status change on a CRM deals board can create onboarding tasks on a work management board. Click Automate on the CRM board, build an automation with the “create item in board & connect boards” action, and map the columns that should carry over.

What’s the best way to sync existing employee records with form submissions instead of creating duplicate items every time someone updates their information?

Use BoardBridge or similar form integration tools that allow you to update existing monday.com items rather than creating new ones. This approach is particularly useful for scenarios like annual benefits enrolment or emergency contact changes, where you want data flowing back to existing employee records instead of generating duplicate entries. Configure your form integration to match submissions against existing items using a unique identifier like employee ID.

How do I monitor integration usage across multiple boards to ensure my automations aren’t creating bottlenecks or redundant data syncs?

Navigate to the Integrations center and click on ‘Account Usage’ at the top right of the integration screen to track how integrations are being used across different boards. This feature helps you identify which integrations are active, how frequently they’re running, and whether they’re working as intended across your workspace.

Can I embed monday.com boards directly into Microsoft Teams and maintain two-way workflow updates without switching platforms?

Yes. The monday.com app for Microsoft Teams lets you add boards as tabs in selected Teams channels, get board notifications from the monday.com bot, and turn conversations into action items. This keeps team updates and project information in one place without switching platforms.

How should I set up Git integration with monday.com dev to automatically reflect code changes without manual status updates?

Install the monday.com app on GitHub, then connect items to their pull requests with the Item ID column. The integration templates can change the status of an item when a pull request that mentions its item ID is created or merged, and add the pull request link to a link column, so code changes show on your dev boards without manual status updates.

What’s the most efficient way to keep time tracking data synchronized with project timelines across multiple boards?

Integrate a time tracking tool like Everhour with monday.com to streamline work hour tracking and monitor productivity while keeping time management data aligned with your project timelines—all within the same platform. This integration allows teams to track actual effort against sprint progress and identify bottlenecks without switching between separate applications.

How do I use connected board data in monday.com automations when mirror columns aren’t directly accessible?

Mirror columns show, and let you edit, data from connected boards, but most can’t trigger automations and they can’t be mapped in automations or integrations. Create matching columns on the main board and use an automation on the connected board to push values over. For complex scenarios, integrate via Make.com to pull connected data via the monday.com API.

What are the steps to set up a two-way sync integration between monday.com and Google Calendar in 2026?

Make sure your board has a Date column, then click the Integrate button on your board to open the board Automations page, search for Google Calendar, and choose a two-way sync template. Map underlined parameters to specific columns for data syncing, and manage connections via the My Connections tab to reconnect or delete as needed.

How can I create cross-board automations to connect items between separate monday.com boards efficiently?

Use the ‘create item in board & connect boards’ action in a custom automation (Automate → Create → Create from scratch), mapping columns like dates, people, or status; a mapped column must exist on both boards. Supported types include Item name, People, Date, Status, Numbers, and more. Subitems carry over when an automation moves an item to another board.

Why can’t I directly map connected board mirror columns to email integrations, and what’s the best workaround?

monday.com doesn’t support Mirror columns in automation and integration mapping, so they can’t feed emails directly. The most reliable native workaround is a bridge setup with matching columns populated via automations from the connected board.

In 2026, how do integration blocks in the workflow builder expand monday.com’s cross-tool capabilities?

On Pro and Enterprise, workflow builder integration blocks bring external tools into a workflow as triggers and actions: for example, Slack blocks notify users or a channel, and Gmail and Outlook blocks start a workflow when an email arrives or send an email. You add them while building the workflow, not from a board’s Integrate menu.

How do I manage and track usage of multiple integrations across boards without exceeding limits on Professional plans?

In the Board Automation Center’s Manage tab, use My Connections to reconnect, edit, or delete integrations, and check the Usage tab for cross-board action tracking. Pro plans include 25,000 integration actions monthly; monitor to avoid limits.

Power Up Your Projects with monday.com Logo

Ready to boost your productivity? Try monday.com today.
Try monday.comPartner link: TaskRhino may earn a referral fee.

More in monday.com

View all in monday.com
All posts

Before you go

Wait!

Do you know we offer FREE 30-min consultation?

If you have a project in mind, let’s talk.
We are here in Canada. If required, we can meet in person.

Book a free consultation

Free 30-minute call

Setting up monday.com? Plan it with a certified monday.com partner.

with Rakesh PatelFounder and CEO of TaskRhino

Pick a timeSend a message instead

Opens Calendly in a new tab

Certified monday.com PartnerReply within 48 hours110+ clients served